Photo © J. Sokolowski
Photo © J. Sokolowski
Photo © J. Sokolowski
Visualization © HS99
Photo © HS99

Sacrisity

 Back to Projects list
Year
2001

The underground structure of the sacrisity was divided into three main zones: the first one is a corridor which is an extension of the stairs, together with the adjacent wardrobe and the toilet; the second one is the space for awaiting and meetings with the faithful (this is where also the vault was installed, where monstrances and valuable liturgical vessels are kept behind armour glass); the third one is the proper sacristy.

Concrete, wood, stone and frosted glass are the only materials used for the construction of this structure (also for the interior decoration).

Other Projects by HS99

Glos Pomorza
Koszalin
Academic Library
Katowice
Market Square 2
Koszalin
City Hall
Konstancin
H8
Jozefow near Warsaw